{"id":3610,"date":"2022-03-30T15:09:49","date_gmt":"2022-03-30T15:09:49","guid":{"rendered":"https:\/\/www.saundersinc.com\/?p=3610"},"modified":"2023-09-27T20:41:26","modified_gmt":"2023-09-27T20:41:26","slug":"saunders-stantec-team-to-deliver-new-glenwood-maintenance-facility-expansion-for-rfta","status":"publish","type":"post","link":"https:\/\/www.saundersinc.com\/about\/news\/saunders-stantec-team-to-deliver-new-glenwood-maintenance-facility-expansion-for-rfta\/","title":{"rendered":"Saunders-Stantec team to deliver new Glenwood Maintenance Facility expansion for RFTA"},"content":{"rendered":"
(Glenwood Springs, Colo.) – March 30, 2022 –<\/strong> The design-build team of Saunders Construction and Stantec<\/a> are supporting the Roaring Fork Transportation Authority<\/a> (RFTA) with the expansion of its Glenwood Springs Maintenance Facility<\/a> (GMF), located in Glenwood Springs, Colo. The expansion project will address operational deficiencies and accommodate forecasted growth in population and ridership demand, while facilitating the agency\u2019s transition to zero-emission buses (ZEBs).\u00a0 RFTA is the second largest transit agency in Colorado, with the longest fixed route in the US (approximately 125 miles). The agency serves the transit needs of Glenwood Springs, Aspen, Snowmass Village, Pitkin County, Basalt, Eagle County, Carbondale, and New Castle.<\/p>\n The GMF was built in 2002 and designed as a satellite facility to store and maintain 34 buses with a small footprint. However, ridership has grown by 60% since 2002, and today RFTA operates approximately 44 buses from the facility daily (exceeding the current capacity by nearly 30%). Ridership is expected to increase an additional 25% over the next 20 years. Additionally, buses are parked outside during the winter months\u2014where they must be idled to ensure their safety and comfort in cold temperatures\u2014burning more fuel and increasing wear and tear. With the introduction of battery electric buses to the RFTA fleet, a climate-controlled environment is required to maintain efficiency.<\/p>\n This $42 million project includes indoor heated bus storage, a second-level operations facility (including a dispatch suite, reception space for visitors, a drivers room, office spaces, and locker rooms), along with necessary site improvements, including grading, drainage, utilities, landscaping, and employee parking. Future phases will include expanding indoor heated bus storage to 60 buses, new site retaining walls, four battery electric bus chargers, and a fuel and wash lane expansion. The facility is being designed to accommodate future hydrogen vehicles.<\/p>\n \u201cIn partnership with Saunders Construction and RFTA, we are incredibly excited to help deliver the GMF expansion project,\u201d said Merlin Maley, Stantec project principal. \u201cThe project is critical to ensuring RFTA is able to continue safely and reliably meeting the transit needs of the three counties it serves, while creating greater connectivity, reducing fossil fuel emissions, and increasing RFTA\u2019s operational efficiencies.\u201d<\/p>\n \u201cSaunders Construction is proud to partner with RFTA on the new GMF project. As a Colorado company, we are excited to be a part of this project, which will greatly improve the reliability and efficiency of RFTA\u2019s operations,\u201d said Tom Alford, Senior Vice President at Saunders Construction. \u201cWorking as a design-build team with Stantec, we\u2019ve been able to provide RFTA and the GMF expansion project with exceptional design solutions, backed by Stantec\u2019s tremendous expertise in bus transit.\u201d<\/p>\n Saunders Construction holds the prime contract as the design-build contractor, with Stantec leading the design of the project. As designer, Stantec is providing architecture; interior design; lighting design; and mechanical, electrical and plumbing services on the project. Stantec is partnered with SGM, Inc. for civil, survey, and structural services. Bluegreen is providing landscape architecture services and leading the project entitlement process.<\/p>\n The project is expected to break ground in June 2022, with an estimated completion date of early 2024.<\/p>\n","protected":false},"excerpt":{"rendered":" (Glenwood Springs, Colo.) – March 30, 2022 – The design-build team of Saunders Construction and Stantec are supporting the Roaring Fork Transportation Authority (RFTA) with the expansion of its Glenwood Springs Maintenance Facility (GMF), located in Glenwood Springs, Colo. The expansion project will address operational deficiencies and accommodate forecasted growth in population and ridership demand, […]<\/p>\n","protected":false},"author":12,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3610","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"acf":[],"yoast_head":"\n